omg what a total cash grab by drax lol they're just milking the biomass thing as much as possible and now they're getting into datacentre business who needs another power plant when we got enough renewable energy already?
omg just read about drax convertin power plant into datacentre 2027 target date is crazy thinkin theyre usin existing infrastructure like land and cooling systems to cut costs wonder if theyre really gonna make it work tho also what about them wood pellet concerns? didnt they use some sketchy sourcing methods btw you can read more about this on BBC news https://www.bbc.com/news/business-59255541